LOAD 1 · 18 YDS
The Straightforward Half
Matt placed fill sand into the open trench outside. Standard reach, clean drop. Between placements the crew shoveled it into position and graded to finish.
LOAD 2 · 7 YDS
The Half That Took Pure Precision
The trench connected to a manhole on the other side of the utility-room wall — reachable only through the building's front doors. Matt returned with a partial load and threaded the boom inside, lining up the exact angle to drop sand straight into the hole.